Simulation Contributes to Successful Mining Plant Upgrade

The Company
South African mining company Samancor’s Chrome Division exports some of its ore, but more than 80% is converted into three grades of ferrochrome at various alloy works in the Samancor Group, making it the world’s largest integrated ferrochrome producer. Tubatse Ferrochrome, an important supplier of top-quality ferrochrome, is one of these alloy plants.

The Challenges
Timing and synchronization is very important in the melting and tapping process. The raw materials are in the furnace for a predetermined time. The heat levels of the furnaces are controlled by the power input. To achieve the high temperatures that are required, a huge amount of electricity is consumed. When the metal is ready to be tapped, the
ladles and slack pots must be in place so the tap can immediately take place.

Directly after the ladles have been filled with metal, the overhead crane must be available to take the metal to the casting facility. However, unnecessary electricity costs are incurred and throughput is lost if either the cranes or the ladles aren’t available; the result: the tap cannot take place. As a way to keep this from happening, a costly, dramatic upgrade was proposed for the tap floor layout. The main reason for the upgrade was that production could be increased substantially with a new layout.

The Deliverables
Tubatse Ferrochrome decided a simulation study should be performed to test the new design. A model built using Arena® simulation software tested the viability of the proposed layout, with special emphasis on throughput. The main question was whether the new layout would be able to produce at double the rate of the current layout.

The study had to sort out the overhead crane rules, determine the number of cranes
required, assess the maximum throughput of the plant, and determine system constraints at maximum throughput.

The Results
The new layout, with its recommended number of resources, has been imple- mented successfully. The Arena model proved that the new layout would produce the projected throughput without losing any tap opportunities. The model identi- fied constraints in the system and, after scrutinizing overhead crane rules and use, revealed that two cranes could be taken out of the system.

(Download PDF)

For more Successes Stories click on the links below

Simulation software used to Optimize Throughput at an Aluminum Smelting Operation.
Simulation Helps to Determine Stock Levels and Stock Space
Simulation Helps Steel Company Develop New Market Strategy
Simultation helped an Oil Refinery Improves Throughput and Efficiency
The Right Equipment for the Right Job with Simulation
Determining Resources Needed to Maintain High Service Levels with simulation software.
Aluminum Plant Improves System Flow by Nearly 50% using the Arena Simulation Software.

                                             